Expansion Updates

 

Construction Update

     This temple construction update was prepared by the Volunteer Construction Advisory Committee (CAC) under the leadership of Board members Ravi Nadesan & Meena Ravi Annamalai. The CAC is made up of professionals in the fields of Architecture, Civil Engineering, Mechanical, Plumbing and Electrical Engineering, Construction Job Management, Estimating and Field Work.

     In preparation for the construction, 3 buildings have been demolished. Another building is required to be demolished before pouring foundation. The site has undergone preliminary preparations for construction and vegetation has been cleared out. Soil testing and geo drilling was performed to determine the soil conditions at the site. The successful completion of the Storm Drain Crossing, a City of Concord required On-Site preparation, was a major accomplishment. We blocked 2 lanes of Concord Boulevard for several days to complete the major project.

Ongoing Meetings

  • Weekly Skype meetings with engineers & consultants
  • Response preparation to address City of Concord Plan Check Department’s Comments by Architect, S.E., etc
  • Coordination between CAC, Different Departments and Consultants
  • Weekly several tele-conferences between the architect, the stapathi, the consultants, & the CAC

This is a first comprehensive update detailing progress of Construction to date.
We plan to send brief Construction updates regularly in future.

 

Kal Thiruppani
Work in Progress since July 2017
Carving of Murugan Garbagruha at India Site

 

Please visit our temple website & Facebook Page.
Website: http://shivamurugan.mskpservices.com/
Facebook Page: https://www.facebook.com/ShivaMuruganTempleConcord

 

Proposed New Temple

 

 

Proposed Annex Building with Auditorium & Facilities